Cessna`s littlest, The 120 work goes on

With a little warmer weather, (55 degrees) Andy applies a coat of epoxy primer to the 120 gear legs and Firewall.

With the Continental C-85 removed from the airframe work has begun on a top over haul . Two cracked cylinders were found,  two replacement cylinders and the remaing two cylinders  O/H`d, were replacing the old parts with new pistons,piston pins, rings,valves and o/h`d rocker arms we`ll  have a great C-85 for the finished 120. Even with a compression check the cracked cylinders did`nt show a problem.The engine would have gone until a failure if we hadn’t torn  into the C-85 . Peace of mind!!

No comments yet.

Leave a Reply